Launch HN: ProvenMetal (YC S26) delivers circuit boards in days instead of weeks

188 points - yesterday at 3:59 PM


Hey HN, we’re Will & Johnny from ProvenMetal (https://provenmetal.com). You send us design files or specs and we give you assembled boards domestically in days.

The US produced 30% of PCBs globally in 2000, now they produce 4%. Chinese manufacturers have completely dominated this space at 55% of global production.

Now, the need for a domestic PCB supply chain is higher than ever before, yet the infrastructure has been dissolving over the last 2 decades. What is left is mostly small family run manufacturers (CMs) that have been operating in largely the same, labor intensive way since the early 2000’s.

When you place an order through a CM it typically takes several days to receive a quote and complete design for manufacture review, and then you have to source all of the components (the hardest part) and bare boards yourself, then wait anywhere from a few days to several weeks for the assembly and testing of those boards.

We started off assembling circuit boards out of a garage with prosumer grade equipment (NeoDen YY1, Glenbrook X-ray, solder paste stencils, and manual rework stations). We believed that by owning the manufacturing process, we could turn all the front of house automations inwards. But here’s the thing… manufacturing circuit boards with prosumer grade equipment out of a garage takes a huge amount of time. Suddenly we were spending 90% of our time assembling circuit boards instead of growing the business. We were completely capacity constrained, with fancy software automations that are not the binding constraint at low volumes.

Then we got our heads out of the weeds, took a step back, and realized that we were trying to solve the wrong bottlenecks.

These manufacturers are good at manufacturing and terrible at the front of house (quoting, DFM review, and part procurement). When you look at the full process, you realize that assembly is not the bottleneck. So we stopped trying to solve the problem that we can’t solve at this stage.

We measured the bottlenecks and nailed down the ones that we are best positioned to solve right now.

When a customer wants a domestically manufactured circuit board, it is not a straight forward process. We are making that process easy through front of house automation. A customer gives us their design files, and we automatically procure components, and co-ordinate bare board fabs and assembly houses to get quotes, design review, and manufacturing completed in a very tight loop.

How we solve part procurement (you can’t assemble boards with no parts!): When a user places an order with us, our system automatically sources their bill of materials across US and overseas distributors. However, when we work with customers during the design process, our plug-ins interact with KiCAD and Altium, sending the BOM to our ordering platform, which allows us to automatically procure components before layout is finalized.

KiCAD plugin: (https://github.com/proven-metal/provenmetal-kicad)

Altium plugin: (https://github.com/proven-metal/provenmetal-altium)

This enables us to order long lead time parts in advance, suggest alternatives if parts are out of stock, and solve the biggest bottleneck in the process. We store parts in our hq in SF, and then kit the boards and route them through our network. We also do long term storage of parts for long lead time items.

How we solve endless emails: Every manufacturer wants the same information in a different shape. There’s usually a few days of back and forth emailing to achieve clarity. We’re building a profile per manufacturer and sending the order to fit their requirements. This may sound trivial but it removes a multi-day round trip on most orders, which on a quick-turn build is a meaningful share of the time.

How to solve design review: Each manufacturer has individual capability sheets, and so we have a heuristic harness that Fable 5 uses to check the board for DFM issues. We’re building a streamlined process for end-to-end pcb manufacturing, but is that enough to solve the supply chain? Not a chance. Capacity is the problem, and no amount of smart software will solve it. We’re extracting real slack from the system today, that slack is finite, and at some volume the only remaining move is adding physical capacity. We think that’s where this goes.

We charge a simple margin on the order value depending on order complexity with fully transparent quote breakdowns. We took our first paying order in less than a week and we’ve done roughly $70k across 11 orders in 6 weeks.

We are very interested in your opinion. We’re working in a problem space that has problems everywhere, we’re constantly pulled in wild directions regarding which problems we solve and how we go about solving them. What do you know that we can learn from?

Source

Comments

amirhirsch yesterday at 6:47 PM
Good luck! One valuable differentiation you could provide is a line of credit. If you can’t win on price, you can help your customers win on cash-conversion cycle.

I’ve been making hardware for 20 years. My highest-volume product was Flybrix, a LEGO drone kit manufactured by Seeed and UniPrecision in China and by Sparqtron in Fremont, California. I’d be happy to work with you on a v2 reboot: Flybrix Swarmz, because every American high school needs a drone swarm.

Beyond that, I’ve worked with many domestic suppliers and built ITAR-controlled products as well. Even without owning the production capacity, if you can offer Net 90 on fabrication and extend credit for components--beyond existing DigiKey, Arrow, Mouser, and vendor credit lines--then I can build products and get paid without putting all the capital at risk upfront.

Factoring is expensive, especially against a purchase order rather than an invoice, and I don’t know of anyone offering working-capital credit based solely on an SBIR award.

Credit is what makes the spice flow.

ac29 yesterday at 4:32 PM
Any idea what pricing will be like? The fact that you call out Drone and Defense industries on your page suggests to me this is extremely expensive.

I recently priced out getting a PCB done in China and its insanely cheap. My design isnt complicated, a few ICs, a few connectors, an a dozen or so passives. PCB manufacturing, parts, and soldering/assembly is on the order of $10-20 total per board and that is with zero volume discounts. The parts alone would cost that much in the US, and I suspect the sort of companies that you contract out to also aren't really interested in tiny orders so they would probably quote huge setup fees (looks like your average order so far is ~$7000).

seizethecheese yesterday at 4:58 PM
I ran a hardware startup for about a decade. We ended up doing all PCB assembly in China. We did try to find this in the USA, but it was indeed too slow and expensive.

The bottleneck in assembling a PCB is usually component sourcing. My product was not the most complicated, and even then, to assemble in Shenzhen, China, it often took a few weeks to get all the components.

The core issue here is that latency is determined by the outliers. Assembly can't start until you have all units, and the hardest to source one is the bottleneck!

To me, the core innovation here is to plug into the design software to source these long tail items ahead of time.

It's pretty interesting that usually when the PCB is being designed, the designer has no awareness of supply chain. They'll bake in a chip that has a 4 week lead time without even realizing it, when a similar component might be one cent more expensive with much faster lead time.

codehero today at 3:30 AM
Love the energy, but I can hardly believe the title "Proven Metals" because your website does not stand up to basic scrutiny:

1) First issue: I do not know what your manufacturing constraints are for PCBs...the number of layers is not documented. I don't even know if you support FlexPCBs.

2) I suppose I could figure out if you could make my boards in seven days if I played your upload game...but I should have to do that. Even the following site, with its clunky UI, makes it more clear what they can or can't do: https://quickturnpcb.co.kr/

3) You say you ship "tested" boards, but what does that mean? Firmware testing? Emissions testing? If you ultimately choose the MPNs, does that mean you own the failures if the board doesn't come up?

4) It's not clear if you accept consigned parts. It's not even clear if you are properly storing the parts you are kitting with respect MSL, ESD, etc.

5) In the end, what makes you any different from a typical broker like Millenium Circuits Limited? (Not that I am endorsing them, as I have had terrible experience from them as well)

6) If you are owning testing and promising quick turnarounds, I would assume you are actually shipping test fixtures to the CM before they ship so they can rework if necessary. But again unclear from your description

alexsherrick today at 3:02 AM
1. Do you fabricate in-house, or through partner fabs? If partners, where are they located?

2. Can you do 6-layer 1+4+1 HDI - laser microvias (0.100 mm), stacked microvias over buried vias, sequential lamination?

3. Can you do via-in-pad fill and planarize (Type VII / VIPPO)? I have ~218 vias on one board needing it.

4. What's your minimum copper-to-copper clearance? Can you do 0.075 mm with a waiver.

jpatten yesterday at 8:17 PM
I hope you guys are successful because I would love to see more US options in this space. Realistically, you can get boards in 7 days from China, and competing with them on price seems like a challenge. So that leaves ITAR and people who need boards even faster. Sounds like that’s where you’re focusing your energy already. What pick and place are you using now that you’ve moved on from the Neoden world?
stopachka yesterday at 4:52 PM
This is an exciting project! My main feedback: you can definitely tell the website content is AI-generated. It's okay to vibe code the design, but I really hesitate when I see vibed writing.
Animats yesterday at 11:43 PM
Is there a standard parts list of immediately available parts, like JLBPCB? [1]

[1] https://jlcpcb.com/parts/in-stock-parts

eaurouge yesterday at 10:36 PM
> Now, the need for a domestic PCB supply chain is higher than ever before, yet the infrastructure has been dissolving over the last 2 decades. What is left is mostly small family run manufacturers (CMs) that have been operating in largely the same, labor intensive way since the early 2000’s.

Would really like to see you guys succeed. We definitely need more manufacturers in the US. But this isn't quite true. Not now, and I'm not sure it's ever been the case in the two decades plus that I've been in hardware. Apart from manufacturers like Sierra Circuits in the Bay Area and Advanced PCB in Colorado that have been around all of that time, we had Tempo (in SF then but no longer), and now have MacroFab (Houston) and CircutHub (also YC, somewhere on the East Coast I think).

bloggie yesterday at 5:38 PM
When you say PCB at the beginning are you referring to raw PCBs or PCBAs? Presumably your service will be sourcing raw PCBs from China still and just doing PCBA?

When my pal’s raw PCB company went out of business, you could buy a finished PCB from China for less than the cost of FR4, which also came from China. How do you intend to address this supply chain risk? Once China raises your cost of raw PCBs your price argument no longer works.

Also, are you sourcing components from US sources or using China? Recently I stopped purchasing from Digikey and Mouser because their services are much slower than they used to be, and I now get components much faster and for lower cost in China.

montyanne yesterday at 4:35 PM
> Suddenly we were spending 90% of our time assembling circuit boards instead of growing the business

> When you look at the full process, you realize that assembly is not the bottleneck.

I’m confused, which one is it?

I assume the growth story isn’t great when you factor in the non-automatable tasks and big capital outlays, so your product leaves that to existing CMs and scales the software stack instead?

Do you see this product as being beneficial to subcontractors (presumably still doing the 90% manual work), or does this legitimately reduce the actual workload/costs at the production level?

bfeynman yesterday at 4:15 PM
This would be incredible for innovation if we can bring this back domestically. It's very hard given lack of raw materials and the supply chain around it often also requires robust network but hopefully this spurs something.

This is something that takes real expertise though, kind of a moonshot for an inexperienced team unfortunately. Would be cool if had mission driven backers otherwise will just end up being hobbyist material. Relying on defense (bubble?) gives at least some breathing room as not actually competing against china for better prices.

rta5 yesterday at 8:28 PM
This looks like it has a long way to go before it is usable. Clicking 'Capabilities' largely just gives me the 7 day turn spiel again, while I'd expect something about min trace / space, HDI capabilities, number of layers, any fancy laminates, etc. For assembly I'd need to know more about min pitch / package size, available types of solder paste, etc. If you're doing PCB sourcing AND assembly (like it sounds like in the text here), that is not clear on the site.

Also, for slow old industries (like Automotive), you'd likely need a fast way to coordinate NDAs just to get an engineer to be allowed to share the design files with you.

mchusma today at 2:00 AM
Cool! I wish there was a way to print boards for hobby purposes. What is the lowest price you would work with? Ballpark
seveibar yesterday at 10:07 PM
We (tscircuit) are trying to develop a PCB fabrication method that's compatible with US regulation (i.e. a dry process without etchants)- we're seeing awesome results using UV lasers [1]. Would love to chat sometime!

[1] https://x.com/seveibar/status/2085438976622780654?s=20

tonyarkles yesterday at 4:30 PM
I love to see new players in this space! We’ve done a ton of PCBA through Macrofab. My relationship with them goes back far enough to have been a beta customer and I’ve chatted on the phone with the CEO a few times. It’s interesting comparing what you’re offering and what they offer. When I started using them, the fact that you could just upload Eagle or KiCAD files, get an instant quote, and verify MPN/BOM and parts placement online… without having to zip up and email Gerbers was extraordinary. Their lead-time is longer than yours, around 3 weeks, but the pricing has always kinda hit a sweet spot.

I noticed your KiCAD plugin there too. I am super curious to see what your workflow and pricing looks like. There are definitely times when the 7-day turnaround will be a game changer for us.

I guess one gate there: do you ship to Canada? We do have a US branch that could do the export-import for us, but way easier if we don’t have to route it through them as far as end-to-end delivery time goes.

pclark yesterday at 5:02 PM
I think this is a huge opportunity — speed, domestic production _and_ overall usability of the process - i do think appearing serious business matters a lot in this space, i found your site a little lacking in terms of prose, details, etc. Really great idea though.
AussieWog93 yesterday at 10:25 PM
I don't know whether you're looking at small-to-medium batch indie stuff, or big customers, but if it's the former I'd reach out to Josh Lifton from Crowd Supply. Surprisingly accessible guy and this would be a great fit for them.
anonymous_user9 yesterday at 11:58 PM
> we have a heuristic harness that Fable 5 uses to check the board for DFM issues

So OpenAI gets a full copy of every customer board? I wish that was mentioned on the upload page.

jrexilius yesterday at 6:46 PM
I'm super excited to try your service and the KiCad plug-in to move supply-chain dialogue closer to point-of-creation makes a TON of sense. That and the speed seem to be the two points of differentiation from Macrofab, who is my current supplier. They will be stiff competition for you as they are a great shop and have a good software interface and a lot of capabilities. I imagine using you guys for quick turn-around needs and them for production and scale?
the__alchemist yesterday at 9:08 PM
#1: How does this compare in price, parts lib, features etc to JLC? Obviously the price and parts avail will be a challenge.

#2: Is this accessible for hobbyists, prototypes, small companies etc, or is it a service for gov/mil stuff that isn't allowed to use China? (Blue UAS etc)

I'm excited and would love to order a board.

Animats yesterday at 8:24 PM
Drone and defense teams get boards back in 7 days.

Quick turn in the US is 2 to 4 days.[1] That's expensive but available.

[1] https://www.surfacemountsolutions.com/services/quick-turn-pc...

qphe95 yesterday at 5:18 PM
You guys should really be making an end to end PCB machine, sourcing the parts and part inventory for custom PCBs really should be the responsibility of the end user.
realo yesterday at 4:24 PM
Nice but the USA are not our global friends anymore.

Anything available in the EU?

evilelectron yesterday at 5:47 PM
Congratulations!

Your timing could not have been better. Yesterday I was talking to a friend about starting a company to tap into the domestic solar inverter market that is about to have a healthy growth due to FCC banning foreign made inverters with radios.

We are planning to build it around STM32 or ESP32 with US parts sourcing and manufacturing.

We are in the project scoping phase. Hopefully we can get something going soon.

yesod yesterday at 6:44 PM
The "Capabilities" section was not what I was expecting. Layers, via sizing, HDI - where's the details?
scott_h yesterday at 5:45 PM
Each of these pretty established suppliers offer this service:

- Sunstone

- Advanced Assembly

- Sierra Circuits

- Osh Park

They all have ~7 day lead time or shorter. It all comes down to choosing simple processes with generic parts.

Do you have your own machines or just outsource these orders and ensure the supply chain stuff moves along quickly?

I like the idea, more heads in the game makes it cheaper for everyone, but this seems like another hat in the ring.

Natalia724 yesterday at 5:02 PM
The upstream BOM feedback seems especially useful: surfacing availability and lead-time alternatives before layout is final should prevent many avoidable redesign loops. Showing those trade-offs directly in the plugin would make the value easy to evaluate.
throwaway672312 yesterday at 4:24 PM
I work in a building with a board assembly line that sits idle most of the time. They have tried securing outside contract work to fill in the gaps. No takers yet.

The only domestic drivers for board fab and assembly are autmotive and defense. They already have their supply chains running.

wasabi359 yesterday at 5:21 PM
Curious how the pricing compares to overseas fabs once you factor in the 7-day turn — is that gap closing enough for non-defense teams to switch too, or is this mainly aimed at people who need the domestic supply chain regardless of cost?
jackoregankenny yesterday at 9:09 PM
Big congratulations Will. Eager to try when I'm over next
polishdude20 yesterday at 6:29 PM
JLCPCB can make boards in less than 7 days easily and for non drone and defense companies.
toplinesoftsys yesterday at 9:24 PM
PCB made in USA. Fantastic! I love this project.
victor106 yesterday at 7:36 PM
Any resources to learn how to design a circuit board?
otekengineering yesterday at 5:58 PM
how does it compare to https://www.circuithub.com ?
tehwebguy yesterday at 5:20 PM
What are minimums?
pbronez today at 12:00 AM
It’s tricky to compete with your own suppliers. For example, see Microsoft’s dance with Dell & HP when they launched Surface. How do you plan to keep the CMs happy while you’re operating your own line?
namuol yesterday at 4:32 PM
> Drone and defense teams get boards back in 7 days

Oh

tgtweak yesterday at 7:14 PM
Amazing, now if we could just get this for silicon wafers :D All joking aside, would be great to get something like this for shuttle run wafer taping vs the current 6+ month window.
Onavo yesterday at 4:28 PM
I hate to ask this..but how exactly do you plan to turn this into a scalable business beyond being yet another Oshkosh? Sure it's profitable but there's a reason hardware manufacturing is generally outsourced to the lowest bidder. Outside of targeting specific sectors e.g. defence, how else do you plan to remain competitive globally? Manufacturing hardware (especially if you are not Apple) is generally a capital intensive, low profit margin business that is extremely sensitive to labor costs. The fact that the past two decades of growth in the US is dominated by tech companies is precisely because software and the associated network effects are able to drive disproportionate amount of growth, unlike hardware. The further down the value chain in hardware the more commoditized you are.
jingpostmedia yesterday at 5:00 PM
[dead]
huflungdung yesterday at 5:02 PM
[dead]
jneal yesterday at 4:54 PM
HN allows ads now?